Installation
1.Pave the kell.The keel should be level and steady. Distance between the keel less than 500mm,in general,four keels are laying down under the 1850mm decking.
2.Pave the decking,using the fastener to install the decking with the keel.(just as show in the drawing)
Treatment
1.This product is for outdoor walkways.Colliding with sharp objects or squeezed by heavy objects should be avoided after the installment.
2.Regular maintenance should be done.Keep the board face clean and clean the decking on time when there are
sundries like sands on it.
3.The first maintenance should be conduct within 3 month of the pavement and maintenances for every 6 months are required.Cleaning method:cleaning up the surface of the decking,then brushing it with protective coating special for strand woven bamboo.